|
The Transportation Master Plan is provided within the following links to inform San Marcos citizens of the product to date of a substantial involvement by interested citizens, city staff, and the Wilbur Smith Associates and associated consultants team.
Double-click on the image of the Master Plan cover page to view the letter of transmittal and the Table of Contents.

Please double click on each of the following hyperlinks to view each respective Master Plan chapter. Please note that these files are large due to graphics that allow the viewer to zoom in for fine-grain review of recommendations throughout the community. The rate of your ability to open these files will depend on the speed of your internet connection. The sizes of the files is listed to provide you a relative comparison of the speed at which you will be able to open the files.
Executive Summary (2.7M) Chapter 1 - Introduction (493K) Chapter 2 - Existing Transportation Conditions (5.2M) Chapter 3 - Travel Demand Model (2.1M) Chapter 4 - Functional Classification System (863K) Chapter 5 - Future Traffic Impacts (3.3M) Chapter 6 - Bicycle and Pedestrian Elements (1.4M) Chapter 7 - Roadway Element (2.7M) Chapter 8 - Recommended Transportation Master Plan (1.4M)
(You must have Adobe Reader or Acrobat on your computer to open these files. Go to Adobe to download this free program.)
|