|
 |
推荐文章 |
|
|
|
|
|
|
|
 |
新闻搜索 |
|
|
|
|
|
|
|
 |
专题文章导航 |
|
|
|
|
|
|
|
|
|
|
| Glossary of Road Traffic Analysis Terms |
| [ 作者: | 来源: | 时间:2006-1-22 13:29:10 ] |
|
Delay due to physical and basic traffic control factors as experienced by a vehicle negotiating the intersection in the absence of any other vehicles (due to a deceleration from the approach cruise speed down to an approach negotiation speed, travel at that speed, acceleration to an exit negotiation speed, and then acceleration to the exit cruise speed). Geometric Stop The effective value of a slow-down and speed-up manoeuvre associated with Geometric Delay, which is measured in terms of equivalent Major Stops. Green Time Duration of the green display for a phase or a movement. Headway The time between passage of the front ends of two successive vehicles. See Spacing. Intergreen Time Duration of the clearance part of the phase corresponding to the period between the phase change point (the end of running intervals) and the beginning of the green display for the next phase (end of phase). Normally, it comprises Yellow Time and All-Red Time. Intra-Bunch Headway Average headway between vehicles in a moving queue (minimum headway in a traffic stream). This is used in order to define moving queues (bunches) of vehicles for the purpose of modelling headway distribution of vehicles. Lane Group A set of lanes with one or two shared lanes (e.g. Lane 1: Left-Turn and Through, Lane 2: Through) or a set of exclusive turn lanes (e.g. a single Right-Turn lane). Glossary of Road Traffic Analysis Terms www.aatraffic.com 5 Lane Utilisation The distribution of vehicles among lanes when two or more lanes are available for a movement. Lane Utilisation Ratio Ratio of the lane degree of saturation to the highest (critical) lane degree of saturation in a Lane Group. Level of Service An index of the operational performance of traffic on a given traffic lane, carriageway, road or intersection, based on service measures such as delay, degree of saturation, density and speed during a given flow period. Major Stop A stop-start cycle that involves a deceleration from the approach cruise speed to zero speed and an acceleration from zero speed to the exit cruise speed. Occupancy Time The time that starts when the front of a vehicle enters the detection zone and finishes when the back of the vehicle exits the detection zone, i.e. the duration of the period when the detection zone is occupied by a vehicle. Off-Peak Period The periods that have low demand volumes of traffic during the day (24-hour period). Opposed Movement A movement (Filter Turn, Permitted Turn, Minor Movement) that gives way to one or more opposing traffic streams at a signalised or unsignalised intersection. Opposing Movement A movement that conflicts with, and has priority over, another (opposed) movement. Overflow An interrupted traffic condition when a number of queued vehicles are not able to depart due to insufficient capacity during a traffic signal or gap-acceptance cycle (also known as cycle failure). Overflow Queue Average number of vehicles per cycle left over at the end of green periods at signals or at the end of acceptable gap (unblock) periods during gap-acceptance process.本新闻共 6页,当前在第 3页 1 2 3 4 5 6 |
|
| 特别声明:本站除部分特别声明禁止转载的专稿外的其他文章可以自由转载,但请务必注明出处和原始作者。文章版权归文章原始作者所有, 本站不凭借所收集资料获取商业利益。对于被本站转载文章的个人和网站,我们表示深深的谢意。如果本站转载的文章有版权问题请联系编辑人员,我们尽快予以更正。 本站所有技术文章、专业软件资料仅供技术人员、高校师生学习交流之用,目的旨在促进与提高中国的交通技术水平;用户获取后不得用于商业目的,否则,所产生的法律责任本站概不负责。 |
|