交通技术。
设为首页
收藏本页
联系我们
首页 >> 专业词库 >> 正文
推荐文章

英文交通词汇与术语释义
中华人民共和国国家标准物流术语
城市公共交通常用名词术语
城市规划基本术语标准GB/T 50280
(台湾版)交通英汉词汇
道路工程英语词汇
交通规则词汇

新闻搜索
专题文章导航

拥挤收费 十一五规划
PTV EMME2
TRANSCAD TOD
交通白皮书 交通影响分析
停车换乘P&R 快速公交BRT



 
英文交通词汇与术语释义
[ 作者: | 来源: | 时间:2006-1-22 13:18:19 ]

A

Arterial
A major thoroughfare.
Automated Vehicle Identification (AVI)
system or Automatic Vehicle Monitoring System or Automatic Vehicle Location System. A system in which electronic equipment on a vehicle sends signals back to a central control facility, locating the vehicle and providing other information about its operations or about its mechanical condition. AVI is also referred to as Automatic Vehicle Monitoring System and Automatic Vehicle Location System.
Average Annual Daily Traffic (AADT)
The total traffic for a year divided by 365.
Average Daily Traffic
is defined as the total traffic volume during a given period (from 1 to 364 days) divided by the number of days in that period. Current ADT volumes can be determined by continuous traffic counts or periodic counts. Where only periodic traffic counts are taken, ADT volume can be established by applying correction factors such as for season or day of week. For roadways having traffic in two directions, the ADT includes traffic in both directions unless specified otherwise.
Average Weekday Daily Traffic (AWDT)
The total traffic for an average weekday. An average weekday is a representative weekday computed as the mathematical average of several typical weekdays selected at random throughout the year. A typical weekday has no anomaly such as heavy traffic due to a special public event or light traffic due to inclement weather. Average Saturday and Sunday data, including holiday service, are determined the same way.

B

Benefit/Cost (B/C) ratio
B/C is used to compare the benefit versus the cost of proposed alternatives. For highway projects, benefits may include reduced fuel consumption, travel time, and air pollution; costs may include construction, right of way, and maintenance.
Bottleneck
Highway sections that experience operational problems such as congestion. Bottlenecks may result from factors other than reduced roadway width. For example, the close spacing of exit and entrance ramps can cause weaving patterns that result in congestion. A less obvious example is a steep freeway grade that can slow trucks and cause a localized "bottleneck."

C

Capital Area Metropolitan Planning Organization (CAMPO) (formerly ATS)
CAMPO is the Metropolitan Planning Organization (MPO) for the Austin area.
Capacity
Capacity refers to a rate of vehicular or person flow that can be expected to traverse a point or uniform section of a lane or roadway during a specific period, which is most often a peak 15-minute period, and which is not the maximum volume that can be accommodated during an hour, under prevailing roadway, traffic, and control conditions. Capacity and Level of Service (LOS) are analyzed separately and are not simply related to each other; both must be fully considered to evaluate the overall operation of a facility. Capacity analysis may be used in the computation of Volume-to-Capacity (V/C) ratios. In some cases, the V/C ratio is used to define LOS.

本新闻共13页,当前在第01页  
01  02  03  04  05  06  07  08  09  10  
11  12  13  

 
上一篇:ITS词汇
下一篇:Glossary of Bicycle Transportation Terms
[打印本页]  [关闭窗口]  [返回顶部]
特别声明:本站除部分特别声明禁止转载的专稿外的其他文章可以自由转载,但请务必注明出处和原始作者。文章版权归文章原始作者所有, 本站不凭借所收集资料获取商业利益。对于被本站转载文章的个人和网站,我们表示深深的谢意。如果本站转载的文章有版权问题请联系编辑人员,我们尽快予以更正。 本站所有技术文章、专业软件资料仅供技术人员、高校师生学习交流之用,目的旨在促进与提高中国的交通技术水平;用户获取后不得用于商业目的,否则,所产生的法律责任本站概不负责。